GO8390 DASP — Application Bones
Status: DRAFT skeleton — posture not yet decided (solo / consortium / consortium-with-ACCO).
Source: GO8390 document pack + digest (GO8390-digest.md), both in this folder. Closes 2pm AEST 16 Jul 2026.
War room: /p/grants-pipeline/dasp on the planner.
Plain-text rules apply to all form fields: no bullets/bold/em-dashes, restricted character set, fill the limits (past-apps lesson: DAS historically used ~50% of limits; GO6984 went in half-empty and lost).
0. The posture decision (BEFORE drafting — due ~17 Jun)
| A. Solo — NT remote specialist | B. Consortium — advocacy partners | C. Consortium WITH Indigenous org | |
|---|---|---|---|
| Likely term | 3yr (6yr possible via remote-coverage lane) | 6yr path | Strongest 6yr story — stacks all 3 named lanes |
| Build cost | Lowest — no herding | Medium | Highest — ACCO approval cycles, governance design |
| Key risk | ”Unlikely… smaller individual organisations” line | Partner herding in 5 wks | Tokenism optics if partnership isn’t real; lead-vs-member call |
| Note | Same shortlist as DPSC (DCLS, IADA, WOSCA) — one call sweep | CONSIDERATION ONLY, not locked (Lukas 11 Jun). ACCOs explicitly invited = competitors unless partners. DAS as MEMBER of an ACCO-led bid also reaches 6yr. Candidates via Scott’s warm lines: Congress, Anyinginyi (both already in Remote Reach partner set). Cultural content → pending cultural review, never authored by us. |
Hybrid worth weighing: submit solo, signal consortium readiness — the form and AWP can name committed referral/partnership arrangements without consortium structure; lowers risk, keeps the remote-coverage 6yr lane open. Check the guidelines wording allows this framing before committing (question to Grant.ATM if unclear — by ~9 Jul).
1. Compliance pack (assemble FIRST — cheap, fatal if missed)
- Mission attachment — de-facto eligibility (“may not be considered eligible” without it). Build from DAS constitution / strategic plan / About text.
- Bank statement ≤6 months old (Tobias).
- NSDS Certificate of Compliance fork — upload current cert if held, else tick Determination. Do NOT start certification early.
- Entity details, indirect cost rate, insurance certificates as form requires.
- 2yr financials per form (check sample form for exact ask).
- On submit: save the Form Receipt email — it is the only copy of the application.
2. AC1 — Alignment (3,500 chars + Activity Work Plan + Mission attachment)
THE SERVICE MODEL
[In-person individual disability advocacy. Equal thirds across the 3 primary
areas: (1) Australia's Disability Strategy outcome areas, (2) negotiating with
NDIS providers, (3) other service systems. ART/appeals work EXCLUDED - never
present it as a funded activity; note it as a separately funded, firewalled
service for continuity context only.]
COVERAGE
[Footprint by SA3: Alice Springs + Barkly + remote communities. The delivery
model that reaches very remote: outreach circuits, interpreter-supported
practice, the Frank Curtis Barkly model. Posture-specific: solo = NT-wide
remote specialist; consortium = coverage map with member roles.]
PRIORITY COHORTS
[DAS's existing client base IS the priority list: First Nations PWD (~half of
NT NDIS participants), very remote, high-barrier, interpreter-requiring.
Numbers from IVO/DEX where defensible - continuity framing, not throughput.]
TRANSITION + CONTINUITY
[NDAP ends 31 Jan 2027; DASP delivery from Nov 2026. DAS clients keep their
advocate with zero service gap. Name the transition plan.]
3. AC2 — Capacity and capability (5,000 chars — the strength zone + Risk Management Plan)
TRACK RECORD
[25+ years continuous Commonwealth/NT funded advocacy in the most remote
jurisdiction. The winning Speaking Up register: first-person plural, modest
but vigorous. Continuity + lived-experience employment outcomes, NOT volume
(DEX is visible to assessors).]
FIRST NATIONS DELIVERY
[Decades of individual advocacy with First Nations clients. Interpreter-
supported practice (AIS). Cultural safety practice. If posture C: genuine
shared governance with ACCO partner - pending cultural review on any
cultural content.]
DISABILITY-LED GOVERNANCE
[Lived-experience structures: Leadership Group lineage since 2016, Revised
Lived Experience Framework (Mar 2026), paid lived-experience roles.]
CONSORTIUM / PARTNERSHIP PROOF
[NDIS Q&S Commission Safeguarding consortium with DCLS + IADA - live, current,
multi-org delivery. Posture B/C: governance design, member table, accountability.]
STAFFING + WORKFORCE
[Named roles + recruitment reality in Alice Springs. Retention story.
Advocate training/induction. Do NOT double-count people committed in DPSC
budgets - one concurrency disclosure paragraph, identical across all DAS
applications this round.]
RISK
[Risk Management Plan template from the GO8390 Attachment Pack. Honest remote
risks: recruitment, travel, cultural load. Concurrency risk (DPSC apps) named
and managed.]
4. AC3 — Efficient and economical use of funds (3,500 chars + Indicative Activity Budget)
BUDGET SHAPE
[Budget ALL 6 YEARS regardless of posture - the department assigns term.
Equal thirds across the 3 primary areas. Systemic advocacy <=10%.
SCHADS rates + on-costs + indexation ~3.2% (the costing kit that won the
Inclusion NT quote).]
REMOTE COST HONESTY
[Real remote loadings: travel, vehicle, interpreter costs (AIS day rates),
accommodation. Under-costing remote delivery is a known assessor red flag -
and the refuters caught DPSC concepts 2-3x under on exactly this. Cost it true.]
VALUE = GEOGRAPHIC MATCH
[The guidelines reward presence where priorities are. Cost per client in very
remote NT vs the alternative (fly-in services or nothing). DAS's marginal cost
of coverage beats any new entrant's setup cost.]
SUSTAINABILITY
[Handle the uncontracted NDAP DoV head-on: extension offered + accepted +
operating; transition planned. Diversified funding base (NT DAIS to 2029,
other lines). No general admin subsidy ask.]
5. Evidence to assemble (week 1)
- IVO/DEX continuity numbers (clients, regions, First Nations %, interpreter use) — defensible only
- Speaking Up restructure run-rate (Mar–Jun 2026) — also serves DPSC AC2
- Q&S consortium description + governance one-pager
- Mission attachment draft
- SCHADS rate card + remote loading table (shared workbook with the DPSC budgets)
- Letters/in-principles per posture (B/C only)
6. Questions for Grant.ATM (if needed — by ~9 Jul)
- Whether a solo applicant with extensive remote coverage can access the 6-year term (test the lane).
- Dual-holding DASP + DPSC confirmation (if not already clear from guidelines re-read).
- (Posture C) Any guidance on consortium composition weighting where an ACCO is a member vs lead.